Home / Service Areas / Bear Branch
Roofing and Siding in Bear Branch Village
Bear Branch publishes its architectural rule plainly: any change to the outside of the house, front, side or back, needs an application first. Plan the roof around that.
Thirty Days, Counted From a Complete Application
Bear Branch Village’s own architectural page says its committee has up to 30 full days to decide, and that the clock starts once the application is open for review and everything required has been received. An application missing the shingle color is not an application yet.
Thirty days is a long time with a tarp on the roof. For planned work, apply before the contractor schedules the crew. For storm work, cover the roof first, then apply for the permanent material.
A Bear Branch Re-Roof, Step by Step
- 1
Get the quote with the product named
Manufacturer, product line and color, in writing.
- 2
Submit to the village
The association’s application with the quote details attached.
- 3
Wait for the written answer
Up to 30 full days once complete.
- 4
City permit
The contractor applies through the Houston Permitting Center.
- 5
Crew and inspection
Tear-off, new roof, City inspection.
On Impact-Resistant Shingles
Texas Property Code §202.011 bars an association from prohibiting shingles designed to resist wind and hail, improve energy efficiency or generate solar power, provided they resemble the allowed shingles, are more durable and of equal or better quality, and fit the look of the neighborhood. That is the outline of the statute, not advice on any particular dispute.
Planning a Bear Branch Roof?
Call early, before the application goes in. An independent contractor can put the product and color on paper for the committee.